Nematron Pointe Controller Manuel d'utilisateur Page 57

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 441
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 56
Pointe Controller User Guide Chapter 3: Quickstart Project
55
3.8 Checking the Chart Integrity
The final step in entry, or modification, of a flow chart is an integrity check. This
integrity check will automatically check the chart for errors in the flow chart
function blocks. It will not tell you if your flow chart logic is correct – it will only
tell you if the statements have been entered properly.
To perform an integrity check, click the Check Integrity tool on the toolbar.
The results of the integrity check will appear in the Message and Error Window
Pane (the box below the editor window). The figure on the right illustrates the
message that you will get if your flow chart contains no statement errors. If an
error is found, a message listing the error and the flow chart block where it is
located, will appear in the Message and Error Window.
Vue de la page 56
1 2 ... 52 53 54 55 56 57 58 59 60 61 62 ... 440 441

Commentaires sur ces manuels

Pas de commentaire